Coming Soon

The AI QS app is
coming to iPhone

Submit drawings and get your priced BOQ back the same day — now from your pocket.

Notify me when it'sLive on the App Store
The AI QS app showing a project dashboard with documents ready to download
AI-Powered Quantity Surveying

Professional BOQs
in Minutes, Not Weeks

Upload your drawings. Get a detailed, professionally formatted Bill of Quantities with accurate UK market rates -- ready to price, tender, or send to your client.

10,000+BOQs Delivered
2 HrsAvg Turnaround
UK · IE · AUCoverage
BOQ -- Residential Extension
Complete
DescriptionQtyRateTotal
Strip foundations 600x250mm18 m£84£1,512
Blockwork below DPC32 m²£62£1,984
100mm concrete floor slab28 m²£48£1,344
Cavity wall insulation56 m²£38£2,128
Roof structure — cut timber28 m²£95£2,660
Section Subtotal£9,628.00
Waffle pod slab 300mm to AS 287028 m²$185$5,180
Brick veneer external walls32 m²$240$7,680
R2.5 wall batts & sarking56 m²$34$1,904
Colorbond roof sheeting on battens28 m²$95$2,660
Termite management to AS 36601 item$1,450$1,450
Section Subtotal ex GST$18,874.00
Rates: Live UK & IE Data
Turnaround: Same Day
Trusted by builders, QS firms & contractors
UK & Ireland market rates
Professional Excel & Word deliverables
2 Hrs typical turnaround

Traditional QS is
Broken for Small Projects

You're either waiting weeks for a QS to come back, overpaying for simple jobs, or winging it with rough estimates that lose you money.

Quotes Take Days or Weeks

Your client needs a price now. By the time a traditional QS gets back to you, the job's gone to someone faster. Speed wins tenders.

QS Fees Eat Your Margin

Paying £1,500--£5,000 for a full QS take-off on a house extension? The maths doesn't work for smaller projects.

Guesswork Costs You Jobs

Price too high and you lose the tender. Price too low and you're working for nothing. Without accurate quantities, you're gambling.

Messy, Inconsistent Docs

Scribbled take-offs on the back of an envelope don't win serious clients. You need professional documentation that builds confidence.

Submit Your Drawings.
Full BOQ Back Same Day.

Send us your construction drawings and we produce a full detailed Bill of Quantities and Findings Report the same day — then generate a polished client copy to send straight on to your client.

portal.theaiqs.co.uk/chat
The AI QS
Dashboard
Projects
Chat
My Rates
AI Memory
1
Submit Drawings
Plans, elevations & specs
2
We Get to Work
Full detailed take-off & pricing
3
Same-Day Delivery
Excel BOQ & Findings Report
4
Client Copy
Ready to send to your client

Professional Deliverables,
Not Just Estimates

Every project comes with a full documentation pack -- the same standard you'd expect from a chartered QS practice.

Excel Bill of Quantities

Fully itemised, professionally formatted BOQ spreadsheet with measured quantities, rates, and section subtotals.

  • Elemental breakdown (substructure, superstructure, finishes, etc.)
  • Current UK/IE market rates applied
  • Location-adjusted pricing
  • Prelims, contingencies & professional fees included

Findings Report

Comprehensive Word document explaining the scope, assumptions, exclusions, and any risks identified during analysis.

  • Project scope & specification notes
  • Building regulations considerations
  • Risk flags & procurement advice
  • Assumptions & exclusions clearly stated

Annotated Take-Off

Marked-up drawings showing exactly what was measured and where, so you can verify every line item in the BOQ.

  • Visual measurement references
  • Dimension verification
  • Area & volume calculations shown
  • Cross-referenced to BOQ items

Follow-Up Support

Questions about your BOQ? Need adjustments or alternative specs priced? We're here to make sure you're confident in every number.

  • Query resolution included
  • Re-pricing for spec changes
  • Value engineering suggestions
  • Direct access to your QS analyst

AI QS vs. Traditional
Quantity Surveying

Same professional output. Fraction of the cost and turnaround time.

Traditional QSAI QS
Typical Turnaround5--14 daysSame day — 2 Hrs
Cost per Project£1,500 -- £5,000+From £49 per BOQ
Professional Excel BOQ
Findings ReportSometimes Always included
Current Market RatesVaries by firm Live UK/IE data
Revisions IncludedExtra charge Included
Available Evenings & Weekends
Scales to Your Workload

Built for the People
Who Build Things

Whether you're a one-man band or managing a pipeline of projects, AI QS fits into your workflow.

Builders & Contractors

Price jobs faster, win more tenders, and stop losing money on underquoted work. Get professional BOQs without the QS bill.

Quantity Surveyors

Overflow work? Tight deadline? Use AI QS as your back-office to handle the volume while you focus on client relationships.

Architects & Designers

Give your clients budget confidence from day one. Include feasibility costs with your design proposals to strengthen your pitch.

Built for Australian
Construction

Not a UK bill with the currency swapped. Australian projects are measured, priced and reported the way Australian builders, estimators and certifiers expect.

Priced in AUD, ex GST

Every rate and total is in Australian dollars. GST at 10% is shown separately so the bill drops straight into a HIA or MBA contract, a tender or a client budget.

Location Factors by State

Rates are adjusted for where the job is: Sydney, Melbourne, Brisbane, Perth, Adelaide, Canberra, Hobart and Darwin, with regional and remote loadings on top. Give us the site address and the factor is applied for you.

Measured to ASMM

Quantities follow the Australian Standard Method of Measurement with AIQS elemental cost categories, so an Australian QS can check the bill line by line.

NCC & Australian Standards

The findings report flags National Construction Code (BCA) requirements and the standards that drive cost: AS 2870 slabs and footings, AS 1684 timber framing, AS 3700 masonry, AS 4100 steel and AS 3660 termite management.

Australian Build Methods

Slab-on-ground and waffle pod, brick veneer and lightweight cladding, Colorbond roofing, plasterboard linings, decks and pergolas. Priced with the materials and trades that are actually on site in Australia.

Site Conditions Costed In

BAL bushfire ratings, cyclone regions C and D, soil classes from the geotech report and NatHERS energy targets all change what a job costs. Show them on the drawings and they show up in the bill.

Location factors we apply Tell us the site address and the right one is applied automatically

SydneyMelbourneBrisbanePerthAdelaideCanberraHobartDarwinGold CoastNewcastleRegional NSW / VIC / QLDRegional WA / SA / TASRemote & FIFO sites

Trusted by Construction Professionals

Every review below is public on Trustpilot — we can't edit or remove any of it.

Read every review on Trustpilot

Individual reviews shown · See the profile for our current rating

Leave a review

Had a BOQ off us?

Reviews go straight to Trustpilot — we can't edit them, delete them or choose which ones show. Takes a minute, and it helps the next builder deciding whether we're worth a go.

Independently verified · Not editable by us

Simple, Transparent Pricing

Start chatting for free. Pay as you go, or save with a bundle — the more you buy, the less each BOQ costs. No subscriptions, no lock-in.

Pay As You Go

Single Job

Perfect for one-off jobs. Upload your drawings and only pay when your documents are ready.

£150 / BOQ

Chat & measurements are free — you only pay when you generate documents.

  • Full Excel Bill of Quantities
  • Word Findings Report
  • Current UK & Ireland market rates
  • Location-adjusted pricing
  • 1 revision included
Get Your BOQ ›

Charged as £150 GBP at checkout (about A$295). Your card converts it for you.

Need higher volume or bespoke features? Get in touch for a custom plan.

Common Questions

Everything you need to know before getting started.

We handle residential extensions, new builds, loft conversions, commercial fit-outs, refurbishments, structural steelwork, metalwork fabrication, heritage conversions, and more. If you can draw it, we can price it. For unusual project types, just ask -- we'll let you know straight away.

We use current UK and Ireland market rates, adjusted for location. Rates are benchmarked against live supplier pricing, industry data, and our own rate library built from hundreds of real projects. Every BOQ is sense-checked against real-world cost benchmarks before delivery.

Yes. Australian projects are priced in Australian dollars using Australian market rates, with location factors by state and for metro, regional and remote sites. Quantities are measured to the Australian Standard Method of Measurement, GST is shown separately, and the findings report references the National Construction Code and the relevant Australian Standards. Use the region toggle in the menu to see the site in AUD.

You receive a professionally formatted Excel spreadsheet (.xlsx) with your BOQ, plus a Word document (.docx) findings report. Both are ready to use -- you can edit them, add your own branding, or send them straight to your client or subcontractors.

Plans, elevations, and sections are ideal. But we can work with whatever you have -- sketches, photos, even a written brief. The more detail you provide, the more accurate the BOQ. We'll flag anything we need clarification on before pricing.

Both. AI handles the heavy lifting -- quantity extraction, rate matching, document generation. But every BOQ is reviewed by a human with construction industry experience to catch anything the AI might miss and ensure the output makes sense in the real world.

Absolutely. We can share example deliverables so you can see the quality and format before placing an order. Just get in touch and we'll send you a sample pack.

Ready to Get Started?

Get Your First BOQ
Today

Upload your drawings, tell us about the project, and we'll get your professional BOQ pack started immediately.